Wednesday, September 29, 2010

Sidewalk Work 9-29-10


Peters Construction has based in the sidewalk up to the portion of the paved swale.  Some minor changes made to the curb layout at the Coventry Woods entrance.  Peters reluctant to open up paved swale because of forecast heavy rain.  Erosion control material being placed for possible rain event.  Dayton Sand and Gravel may be in to do some paving work to prep the edge of roadside for curb installation. 