Peters Construction excavating to base depth for new sidewalk. Met with Steve Blake on site to go over existing pavement conditions. Light mist and 60 degrees for most of the day. Fairpoint on site to look at buried undergound phone line that has been abandoned. Line encountered by Peteres in excavation work.
No comments:
Post a Comment