Peters Construction on site in morning. Cutting pavement with saw attachment for excavator. Drainage structures being delivered by Elm Street Vault.
In the afternoon Gorham Sand and Gravel delivered excavator and loader to install drainage structures and cross road pipes. Gorham Sand and Gravel personnel are accomplishing this work. One drainage structure and cross pipe installed. ADS pipe stockpiled roadside next to remaining drainage structure.
No comments:
Post a Comment