Friday, September 24, 2010

Sidewalk Work 9-24-10

5 cross culverts installed on Cat Mousam Road with basins on the sidewalk side.  Gorham Sand and Gravel installing 2 Type F Basins in ditch line on opposite side of road from Sidewalk.  Drainage pipe to ravine outlet installed.  Gorham Sand and Gravel supervisor said remaining work would be completed by Peters Construction.

No comments:

Post a Comment