Peters Construction on Site cutting out paving behind curb. Discussed adding a 10 ft. drive entrance at #180 for access to rear of lot and matching into existing cobble driveway at #204. Peters to start box cutting sidewalk in PM.
Weather light mist of rain and 60 degrees. One lane traffic being maintained.
No comments:
Post a Comment