Thursday, September 23, 2010

Sidewalk Work 9-23-10

Gorham Sand and Gravel on Site for drainage work.  Cross culvert installed at eastern Spiller Drive Entrance.  2nd cross culvert and structure installed across Cat Mousam Road.  Start of 3rd cross culvert underway.  Chris  Osterrieder and I met with Gorham Sand and Gravel to discuss structure elevations, ditching, existing culverts and installation of an additional catch basin near the eastern Spiller Drive entrance.

No comments:

Post a Comment