Monday, October 18, 2010

Sidewalk Work 10-18-10

Peters construction installing loam in ditchline and rip rapping culvert ends.  One driveway culvert extended with 2 ft. of 12 in. dia. aluminum culvert ea end.  Jeff Nest on site to clean out existing driveway culverts that were not replaced as part of this project.

No comments:

Post a Comment